Document Citation: 42 USCS § 7410

Header:
UNITED STATES CODE SERVICE
TITLE 42. THE PUBLIC HEALTH AND WELFARE
CHAPTER 85. AIR POLLUTION PREVENTION AND CONTROL
PROGRAMS AND ACTIVITIES
AIR QUALITY AND EMISSION LIMITATIONS


Date:
05/08/2013

Document:
§ 7410. State implementation plans for national primary and secondary ambient air quality standards

(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems.
(1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under section 109 [42 USCS § 7409] for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph.
(2) Each implementation plan submitted by a State under this Act shall be adopted by the State after reasonable notice and public hearing. Each such plan shall--
(A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permits, and auctions of emissions rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to meet the applicable requirements of this Act;
(B) provide for establishment and operation of appropriate devices, methods, systems, and procedures necessary to--
(i) monitor, compile, and analyze data on ambient air quality, and
(ii) upon request, make such data available to the Administrator;
(C) include a program to provide for the enforcement of the measures described in subparagraph (A), and regulation of the modification and construction of any stationary source within the areas covered by the plan as necessary to assure that national ambient air quality standards are achieved, including a permit program as required in parts C and D [42 USCS §§ 7470 et seq., 7501 et seq.];
(D) contain adequate provisions--
(i) prohibiting, consistent with the provisions of this title, any source or other type of emissions activity within the State from emitting any air pollutant in amounts which will--
(I) contribute significantly to nonattainment in, or interfere with maintenance by, any other State with respect to any such national primary or secondary ambient air quality standard, or
(II) interfere with measures required to be included in the applicable implementation plan for any other State under part C [42 USCS §§ 7470 et seq.] to prevent significant deterioration of air quality or to protect visibility,
(ii) insuring compliance with the applicable requirements of sections 126 and 115 [42 USCS §§ 7426, 7415] (relating to interstate and international pollution abatement);
(E) provide (i) necessary assurances that the State (or, except where the Administrator deems inappropriate, the general purpose local government or governments, or a regional agency designated by the State or general purpose local governments for such purpose) will have adequate personnel, funding, and authority under State (and, as appropriate, local) law to carry out such implementation plan (and is not prohibited by any provision of Federal or State law from carrying out such implementation plan or portion thereof), (ii) requirements that the State comply with the requirements respecting State boards under section 128 [42 USCS § 7428], and (iii) necessary assurances that, where the State has relied on a local or regional government, agency, or instrumentality for the implementation of any plan provision, the State has responsibility for ensuring adequate implementation of such plan provision;
(F) require, as may be prescribed by the Administrator--
(i) the installation, maintenance, and replacement of equipment, and the implementation of other necessary steps, by owners or operators of stationary sources to monitor emissions from such sources,
(ii) periodic reports on the nature and amounts of emissions and emissions-related data from such sources, and
(iii) correlation of such reports by the State agency with any emission limitations or standards established pursuant to this Act, which reports shall be available at reasonable times for public inspection;
(G) provide for authority comparable to that in section 303 [42 USCS § 7603] and adequate contingency plans to implement such authority;
(H) provide for revision of such plan--
(i) from time to time as may be necessary to take account of revisions of such national primary or secondary ambient air quality standard or the availability of improved or more expeditious methods of attaining such standard, and
(ii) except as provided in paragraph (3)(C), whenever the Administrator finds on the basis of information available to the Administrator that the plan is substantially inadequate to attain the national ambient air quality standard which it implements or to otherwise comply with any additional requirements established under this Act;
(I) in the case of a plan or plan revision for an area designated as a nonattainment area, meet the applicable requirements of part D [42 USCS §§ 7501 et seq.] (relating to nonattainment areas);
(J) meet the applicable requirements of section 121 [42 USCS § 7421] (relating to consultation), section 127 [42 USCS § 7427] (relating to public notification), and part C [42 USCS §§ 7470 et seq.] (relating to prevention of significant deterioration of air quality and visibility protection);
(K) provide for--
(i) the performance of such air quality modeling as the Administrator may prescribe for the purpose of predicting the effect on ambient air quality of any emissions of any air pollutant for which the Administrator has established a national ambient air quality standard, and
(ii) the submission, upon request, of data related to such air quality modeling to the Administrator;
(L) require the owner or operator of each major stationary source to pay to the permitting authority, as a condition of any permit required under this Act, a fee sufficient to cover--
(i) the reasonable costs of reviewing and acting upon any application for such a permit, and
(ii) if the owner or operator receives a permit for such source, the reasonable costs of implementing and enforcing the terms and conditions of any such permit (not including any court costs or other costs associated with any enforcement action),
until such fee requirement is superseded with respect to such sources by the Administrator's approval of a fee program under title V [42 USCS §§ 7661 et seq.]; and
(M) provide for consultation and participation by local political subdivisions affected by the plan.
(3) (A) [Repealed]
(B) As soon as practicable, the Administrator shall, consistent with the purposes of this Act and the Energy Supply and Environmental Coordination Act of 1974, review each State's applicable implementation plans and report to the State on whether such plans can be revised in relation to fuel burning stationary sources (or persons supplying fuel to such sources) without interfering with the attainment and maintenance of any national ambient air quality standard within the period permitted in this section. If the Administrator determines that any such plan can be revised, he shall notify the State that a plan revision may be submitted by the State. Any plan revision which is submitted by the State shall, after public notice and opportunity for public hearing, be approved by the Administrator if the revision relates only to fuel burning stationary sources (or persons supplying fuel to such sources), and the plan as revised complies with paragraph (2) of this subsection. The Administrator shall approve or disapprove any revision no later than three months after its submission.
(C) Neither the State, in the case of a plan (or portion thereof) approved under this subsection, nor the Administrator, in the case of a plan (or portion thereof) promulgated under subsection (c), shall be required to revise an applicable implementation plan because one or more exemptions under section 118 [42 USCS § 7418] (relating to Federal facilities), enforcement orders under section 113(d), suspensions under section 110(f) or (g) [subsecs. (f) or (g) of this section] (relating to temporary energy or economic authority), orders under section 119 [42 USCS § 7419] (relating to primary nonferrous smelters), or extensions of compliance in decrees entered under section 113(e) (relating to iron- and steel-producing operations) have been granted, if such plan would have met the requirements of this section if no such exemptions, orders, or extensions had been granted.
(4) [Repealed]
(5) (A) (i) Any State may include in a State implementation plan, but the Administrator may not require as a condition of approval of such plan under this section, any indirect source review program. The Administrator may approve and enforce, as part of an applicable implementation plan, an indirect source review program which the State chooses to adopt and submit as part of its plan.
(ii) Except as provided in subparagraph (B), no plan promulgated by the Administrator shall include any indirect source review program for any air quality control region, or portion thereof.
(iii) Any State may revise an applicable implementation plan approved under section 110(a) [42 USCS § 7410(a)] to suspend or revoke any such program included in such plan, provided that such plan meets the requirements of this section.
(B) The Administrator shall have the authority to promulgate, implement and enforce regulations under section 110(c) [42 USCS § 7410(c)] respecting indirect source review programs which apply only to federally assisted highways, airports, and other major federally assisted indirect sources and federally owned or operated indirect sources.
(C) For purposes of this paragraph, the term "indirect source" means a facility, building, structure, installation, real property, road, or highway which attracts, or may attract, mobile sources of pollution. Such term includes parking lots, parking garages, and other facilities subject to any measure for management of parking supply (within the meaning of section 110(c)(2)(D)(ii) [42 USCS § 7410(c)(2)(D)(ii)]), including regulation of existing off-street parking but such term does not include new or existing on-street parking. Direct emissions sources or facilities at, within, or associated with, any indirect source shall not be deemed indirect sources for the purpose of this paragraph.
(D) For purposes of this paragraph the term "indirect source review program" means the facility-by-facility review of indirect sources of air pollution, including such measures as are necessary to assure, or assist in assuring, that a new or modified indirect source will not attract mobile sources of air pollution, the emissions from which would cause or contribute to air pollution concentrations--
(i) exceeding any national primary ambient air quality standard for a mobile source-related air pollutant after the primary standard attainment date, or
(ii) preventing maintenance of any such standard after such date.
(E) For purposes of this paragraph and paragraph (2)(B), the term "transportation control measure" does not include any measure which is an "indirect source review program".
(6) No State plan shall be treated as meeting the requirements of this section unless such plan provides that in the case of any source which uses a supplemental, or intermittent control system for purposes of meeting the requirements of an order under section 113(d) or section 119 (relating to primary nonferrous smelter orders) [42 USCS § 7419], the owner or operator of such source may not temporarily reduce the pay of any employee by reason of the use of such supplemental or intermittent or other dispersion dependent control system.

(b) Extension of period for submission of plans. The Administrator may, wherever he determines necessary, extend the period for submission of any plan or portion thereof which implements a national secondary ambient air quality standard for a period not to exceed 18 months from the date otherwise required for submission of such plan.

(c) Preparation and publication by Administrator of proposed regulations setting forth implementation plan; transportation regulations study and report; parking surcharge; suspension authority; plan implementation.
(1) The Administrator shall promulgate a Federal implementation plan at any time within 2 years after the Administrator--
(A) finds that a State has failed to make a required submission or finds that the plan or plan revision submitted by the State does not satisfy the minimum criteria established under section 110(k)(1)(A) [42 USCS § 7410(k)(1)(A)], or
(B) disapproves a State implementation plan submission in whole or in part,
unless the State corrects the deficiency, and the Administrator approves the plan or plan revision, before the Administrator promulgates such Federal implementation plan.
(2) (A) [Repealed]
(B) No parking surcharge regulation may be required by the Administrator under paragraph (1) of this subsection as a part of an applicable implementation plan. All parking surcharge regulations previously required by the Administrator shall be void upon the date of enactment of this subparagraph. This subparagraph shall not prevent the Administrator from approving parking surcharges if they are adopted and submitted by a State as part of an applicable implementation plan. The Administrator may not condition approval of any implementation plan submitted by a State on such plan's including a parking surcharge regulation.
(C) [Repealed]
(D) For purposes of this paragraph--
(i) The term "parking surcharge regulation" means a regulation imposing or requiring the imposition of any tax, surcharge, fee, or other charge on parking spaces, or any other area used for the temporary storage of motor vehicles.
(ii) The term "management of parking supply" shall include any requirement providing that any new facility containing a given number of parking spaces shall receive a permit or other prior approval, issuance of which is to be conditioned on air quality considerations.
(iii) The term "preferential bus/carpool lane" shall include any requirement for the setting aside of one or more lanes of a street or highway on a permanent or temporary basis for the exclusive use of buses or carpools, or both.
(E) No standard, plan, or requirement, relating to management of parking supply or preferential bus/carpool lanes shall be promulgated after the date of enactment of this paragraph [enacted June 22, 1974] by the Administrator pursuant to this section, unless such promulgation has been subjected to at least one public hearing which has been held in the area affected and for which reasonable notice has been given in such area. If substantial changes are made following public hearings, one or more additional hearings shall be held in such area after such notice.
(3) Upon application of the chief executive officer of any general purpose unit of local government, if the Administrator determines that such unit has adequate authority under State or local law, the Administrator may delegate to such unit the authority to implement and enforce within the jurisdiction of such unit any part of a plan promulgated under this subsection. Nothing in this paragraph shall prevent the Administrator from implementing or enforcing any applicable provision of a plan promulgated under this subsection.
(4) [Repealed]
(5) (A) Any measure in an applicable implementation plan which requires a toll or other charge for the use of a bridge located entirely within one city shall be eliminated from such plan by the Administrator upon application by the Governor of the State, which application shall include a certification by the Governor that he will revise such plan in accordance with subparagraph (B).
(B) In the case of any applicable implementation plan with respect to which a measure has been eliminated under subparagraph (A), such plan shall, not later than one year after the date of the enactment of this subparagraph [enacted Aug. 7, 1977], be revised to include comprehensive measures to:
(i) establish, expand, or improve public transportation measures to meet basic transportation needs, as expeditiously as is practicable; and
(ii) implement transportation control measures necessary to attain and maintain national ambient air quality standards,
and such revised plan shall, for the purpose of implementing such comprehensive public transportation measures, include requirements to use (insofar as is necessary) Federal grants, State or local funds, or any combination of such grants and funds as may be consistent with the terms of the legislation providing such grants and funds. Such measures shall, as a substitute for the tolls or charges eliminated under subparagraph (A), provide for emissions reductions equivalent to the reductions which may reasonably be expected to be achieved through the use of the tolls or charges eliminated.
(C) Any revision of an implementation plan for purposes of meeting the requirements of subparagraph (B) shall be submitted in coordination with any plan revision required under part D [42 USCS §§ 7501et seq.].

(d), (e) [Repealed]

(f) National or regional energy emergencies; determination by President.
(1) Upon application by the owner or operator of a fuel burning stationary source, and after notice and opportunity for public hearing, the Governor of the State in which such source is located may petition the President to determine that a national or regional energy emergency exists of such severity that--
(A) a temporary suspension of any part of the applicable implementation plan or of any requirement under section 411 (concerning excess emissions penalties or offsets) of title IV of the Act [42 USCS § 7651j] may be necessary, and
(B) other means of responding to the energy emergency may be inadequate.
Such determination shall not be delegable by the President to any other person. If the President determines that a national or regional energy emergency of such severity exists, a temporary emergency suspension of any part of an applicable implementation plan or of any requirement under section 411 (concerning excess emissions penalties or offsets) of title IV of the Act [42 USCS § 7651j] adopted by the State may be issued by the Governor of any State covered by the President's determination under the condition specified in paragraph (2) and may take effect immediately.
(2) A temporary emergency suspension under this subsection shall be issued to a source only if the Governor of such State finds that--
(A) there exists in the vicinity of such source a temporary energy emergency involving high levels of unemployment or loss of necessary energy supplies for residential dwellings; and
(B) such unemployment or loss can be totally or partially alleviated by such emergency suspension.
Not more than one such suspension may be issued for any source on the basis of the same set of circumstances or on the basis of the same emergency.
(3) A temporary emergency suspension issued by a Governor under this subsection shall remain in effect for a maximum of four months or such lesser period as may be specified in a disapproval order of the Administrator, if any. The Administrator may disapprove such suspension if he determines that it does not meet the requirements of paragraph (2).
(4) This subsection shall not apply in the case of a plan provision or requirement promulgated by the Administrator under subsection (c) of this section, but in any such case the President may grant a temporary emergency suspension for a four month period of any such provision or requirement if he makes the determinations and findings specified in paragraphs (1) and (2).
(5) The Governor may include in any temporary emergency suspension issued under this subsection a provision delaying for a period identical to the period of such suspension any compliance schedule (or increment of progress) to which such source is subject under section 119, as in effect before the date of the enactment of this paragraph [enacted Aug. 7, 1977] or section 113(d) of this Act, upon a finding that such source is unable to comply with such schedule (or increment) solely because of the conditions on the basis of which a suspension was issued under this subsection.

(g) Governor's authority to issue temporary emergency suspensions.
(1) In the case of any State which has adopted and submitted to the Administrator a proposed plan revision which the State determines--
(A) meets the requirements of this section, and
(B) is necessary (i) to prevent the closing for one year or more of any source of air pollution, and (ii) to prevent substantial increases in unemployment which would result from such closing, and
which the Administrator has not approved or disapproved under this section within 12 months of submission of the proposed plan revision, the Governor may issue a temporary emergency suspension of the part of the applicable implementation plan for such State which is proposed to be revised with respect to such source. The determination under subparagraph (B) may not be made with respect to a source which would close without regard to whether or not the proposed plan revision is approved.
(2) A temporary emergency suspension issued by a Governor under this subsection shall remain in effect for a maximum of four months or such lesser period as may be specified in a disapproval order of the Administrator. The Administrator may disapprove such suspension if he determines that it does not meet the requirements of this subsection.
(3) The Governor may include in any temporary emergency suspension issued under this subsection a provision delaying for a period identical to the period of such suspension any compliance schedule (or increment of progress) to which such source is subject under section 119 as in effect before the date of the enactment of this paragraph [enacted Aug. 7, 1977], or under section 113(d) upon a finding that such source is unable to comply with such schedule (or increment) solely because of the conditions on the basis of which a suspension was issued under this subsection.

(h) Publication of comprehensive document for each State setting forth requirements of applicable implementation plan.
(1) Not later than 5 years after the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990], and every 3 years thereafter, the Administrator shall assemble and publish a comprehensive document for each State setting forth all requirements of the applicable implementation plan for such State and shall publish notice in the Federal Register of the availability of such documents.
(2) The Administrator may promulgate such regulations as may be reasonably necessary to carry out the purpose of this subsection.

(i) Modification of requirements prohibited. Except for a primary nonferrous smelter order under section 119 [42 USCS § 7419], a suspension under section 110(f) or (g) [subsec. (f) or (g) of this section] (relating to emergency suspensions), an exemption under section 118 [42 USCS § 7418] (relating to certain Federal facilities), an order under section 113(d) (relating to compliance orders), a plan promulgation under section 110(c) [subsec. (c) of this section], or a plan revision under section 110(a)(3) [subsec. (a)(3) of this section], no order, suspension, plan revision, or other action modifying any requirement of an applicable implementation plan may be taken with respect to any stationary source by the State or by the Administrator.

(j) Technological systems of continuous emission reduction on new or modified stationary sources; compliance with performance standards. As a condition for issuance of any permit required under this title, the owner or operator of each new or modified stationary source which is required to obtain such a permit must show to the satisfaction of the permitting authority that the technological system of continuous emission reduction which is to be used will enable such source to comply with the standards of performance which are to apply to such source and that the construction or modification and operation of such source will be in compliance with all other requirements of this Act.

(k) Environmental Protection Agency action on plan submissions.
(1) Completeness of plan submissions.
(A) Completeness criteria. Within 9 months after the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990], the Administrator shall promulgate minimum criteria that any plan submission must meet before the Administrator is required to act on such submission under this subsection. The criteria shall be limited to the information necessary to enable the Administrator to determine whether the plan submission complies with the provisions of this Act.
(B) Completeness finding. Within 60 days of the Administrator's receipt of a plan or plan revision, but no later than 6 months after the date, if any, by which a State is required to submit the plan or revision, the Administrator shall determine whether the minimum criteria established pursuant to subparagraph (A) have been met. Any plan or plan revision that a State submits to the Administrator, and that has not been determined by the Administrator (by the date 6 months after receipt of the submission) to have failed to meet the minimum criteria established pursuant to subparagraph (A), shall on that date be deemed by operation of law to meet such minimum criteria.
(C) Effect of finding of incompleteness. Where the Administrator determines that a plan submission (or part thereof) does not meet the minimum criteria established pursuant to subparagraph (A), the State shall be treated as not having made the submission (or, in the Administrator's discretion, part thereof).
(2) Deadline for action. Within 12 months of a determination by the Administrator (or a determination deemed by operation of law) under paragraph (1) that a State has submitted a plan or plan revision (or, in the Administrator's discretion, part thereof) that meets the minimum criteria established pursuant to paragraph (1), if applicable (or, if those criteria are not applicable, within 12 months of submission of the plan or revision), the Administrator shall act on the submission in accordance with paragraph (3).
(3) Full and partial approval and disapproval. In the case of any submittal on which the Administrator is required to act under paragraph (2), the Administrator shall approve such submittal as a whole if it meets all of the applicable requirements of this Act. If a portion of the plan revision meets all the applicable requirements of this Act, the Administrator may approve the plan revision in part and disapprove the plan revision in part. The plan revision shall not be treated as meeting the requirements of this Act until the Administrator approves the entire plan revision as complying with the applicable requirements of this Act.
(4) Conditional approval. The Administrator may approve a plan revision based on a commitment of the State to adopt specific enforceable measures by a date certain, but not later than 1 year after the date of approval of the plan revision. Any such conditional approval shall be treated as a disapproval if the State fails to comply with such commitment.
(5) Calls for plan revisions. Whenever the Administrator finds that the applicable implementation plan for any area is substantially inadequate to attain or maintain the relevant national ambient air quality standard, to mitigate adequately the interstate pollutant transport described in section 176A or section 184 [42 USCS § 7506a or § 7511c], or to otherwise comply with any requirement of this Act, the Administrator shall require the State to revise the plan as necessary to correct such inadequacies. The Administrator shall notify the State of the inadequacies, and may establish reasonable deadlines (not to exceed 18 months after the date of such notice) for the submission of such plan revisions. Such findings and notice shall be public. Any finding under this paragraph shall, to the extent the Administrator deems appropriate, subject the State to the requirements of this Act to which the State was subject when it developed and submitted the plan for which such finding was made, except that the Administrator may adjust any dates applicable under such requirements as appropriate (except that the Administrator may not adjust any attainment date prescribed under part D [42 USCS §§ 7501 et seq.], unless such date has elapsed).
(6) Corrections. Whenever the Administrator determines that the Administrator's action approving, disapproving, or promulgating any plan or plan revision (or part thereof), area designation, redesignation, classification, or reclassification was in error, the Administrator may in the same manner as the approval, disapproval, or promulgation revise such action as appropriate without requiring any further submission from the State. Such determination and the basis thereof shall be provided to the State and public.

(l) Plan revisions. Each revision to an implementation plan submitted by a State under this Act shall be adopted by such State after reasonable notice and public hearing. The Administrator shall not approve a revision of a plan if the revision would interfere with any applicable requirement concerning attainment and reasonable further progress (as defined in section 171 [42 USCS § 7501]), or any other applicable requirement of this Act.

(m) Sanctions. The Administrator may apply any of the sanctions listed in section 179(b) [42 USCS § 7509(b)] at any time (or at any time after) the Administrator makes a finding, disapproval, or determination under paragraphs (1) through (4), respectively, of section 179(a) [42 USCS § 7509(a)] in relation to any plan or plan item (as that term is defined by the Administrator) required under this Act, with respect to any portion of the State the Administrator determines reasonable and appropriate, for the purpose of ensuring that the requirements of this Act relating to such plan or plan item are met. The Administrator shall, by rule, establish criteria for exercising his authority under the previous sentence with respect to any deficiency referred to in section 179(a) [42 USCS § 7509(a)] to ensure that, during the 24-month period following the finding, disapproval, or determination referred to in section 179(a) [42 USCS § 7509(a)], such sanctions are not applied on a statewide basis where one or more political subdivisions covered by the applicable implementation plan are principally responsible for such deficiency.

(n) Savings clauses.
(1) Existing plan provisions. Any provision of any applicable implementation plan that was approved or promulgated by the Administrator pursuant to this section as in effect before the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990] shall remain in effect as part of such applicable implementation plan, except to the extent that a revision to such provision is approved or promulgated by the Administrator pursuant to this Act.
(2) Attainment dates. For any area not designated nonattainment, any plan or plan revision submitted or required to be submitted by a State--
(A) in response to the promulgation or revision of a national primary ambient air quality standard in effect on the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990], or
(B) in response to a finding of substantial inadequacy under subsection (a)(2) (as in effect immediately before the date of the enactment of the Clean Air Act Amendments of 1990) [enacted Nov. 15, 1990],
shall provide for attainment of the national primary ambient air quality standards within 3 years of the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990] or within 5 years of issuance of such finding of substantial inadequacy, whichever is later.
(3) Retention of construction moratorium in certain areas. In the case of an area to which, immediately before the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990], the prohibition on construction or modification of major stationary sources prescribed in subsection (a)(2)(I) (as in effect immediately before the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990]) applied by virtue of a finding of the Administrator that the State containing such area had not submitted an implementation plan meeting the requirements of section 172(b)(6) [42 USCS § 7502(b)(6)] (relating to establishment of a permit program) (as in effect immediately before the date of enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990]) or 172(a)(1) [42 USCS § 7502(a)(1)] (to the extent such requirements relate to provision for attainment of the primary national ambient air quality standard for sulfur oxides by December 31, 1982) as in effect immediately before the date of the enactment of the Clean Air Act Amendments of 1990 [enacted Nov. 15, 1990], no major stationary source of the relevant air pollutant or pollutants shall be constructed or modified in such area until the Administrator finds that the plan for such area meets the applicable requirements of section 172(c)(5) [42 USCS § 7502(c)(5)] (relating to permit programs) or subpart 5 of part D [42 USCS §§ 7514 et seq.] (relating to attainment of the primary national ambient air quality standard for sulfur dioxide), respectively.

(o) Indian tribes. If an Indian tribe submits an implementation plan to the Administrator pursuant to section 301(d) [42 USCS § 7601(d)], the plan shall be reviewed in accordance with the provisions for review set forth in this section for State plans, except as otherwise provided by regulation promulgated pursuant to section 301(d)(2) [42 USCS § 7601(d)(2)]. When such plan becomes effective in accordance with the regulations promulgated under section 301(d) [42 USCS § 7601(d)], the plan shall become applicable to all areas (except as expressly provided otherwise in the plan) located within the exterior boundaries of the reservation, notwithstanding the issuance of any patent and including rights-of-way running through the reservation.

(p) Reports. Any State shall submit, according to such schedule as the Administrator may prescribe, such reports as the Administrator may require relating to emission reductions, vehicle miles traveled, congestion levels, and any other information the Administrator may deem necessary to assess the development effectiveness, need for revision, or implementation of any plan or plan revision required under this Act.